Features
- For applications where more current is required than 1 SM15K unit can deliver
- Optimal dynamic response in parallel operation
- Fast reaction time: up to 250 uSec
Functionalities
- Multiple power supplies behave as one large system
- All information visible on master
- For SM15K series only and max. 1 pc INT MOD M/S 2 per unit possible
- Master/Slave parallel operation SM500-CP-90, SM1500-CP-30: up to 60 units (identical)
- Max. 6 units SM70-CP-450 in parallel operation
- Max. 6 units SM500-CP-90 in series operation
- Series operation not possible for SM70-CP-450 and SM1500-CP-30
- Installation in slot 3 or 4 only (rear end of power supply)
- Easy to plug in or remove by user at site
Options
-
Master/Slave assembly kit SM15K
Connection sets for Master/Slave set-ups using the M/S PAR and the M/S SER assembly kits.
SM70-CP-450
- M/S PAR SET A2 for 2 units in parallel
- M/S PAR SET A3 for 3 units in parallel
- M/S PAR SET A4 for 4 units in parallel
- M/S PAR SET A5 for 5 units in parallel
- M/S PAR SET A6 for 6 units in parallel
SM210-CP-150, SM500-CP-90 and SM1500-CP-30
- M/S PAR SET C2 for 2 units in parallel
- M/S PAR SET C3 for 3 units in parallel
- M/S PAR SET C4 for 4 units in parallel
- M/S PAR SET C5 for 5 units in parallel
- M/S PAR SET C6 for 6 units in parallel
- M/S PAR SET C7 for 7 units in parallel
- M/S PAR SET C8 for 8 units in parallel
- M/S PAR SET C9 for 9 units in parallel
- M/S PAR SET C10 for 10 units in parallel
- M/S PAR SET C11 for 11 units in parallel
- M/S PAR SET C12 for 12 units in parallel
- 13 to 20 in parallel see application note
- 21 to 60 in parallel contact factory
SM500-CP-90
- M/S SER SET BA for 2 units in series
- M/S SER SET BB for 3 to 6 units in series
|
Data sheet
Product manual